Getting a New Electricity Connection for Your Development: A Step-by-Step Guide
- morganisedltd
- Jul 2
- 2 min read
When it comes to new developments, getting the electricity connection sorted early can make all the difference to your timeline and budget. Whether you’re working on a single plot, a commercial unit, or a full-scale housing development, here’s what you need to know about securing a new electric connection, without the stress.

What Is a New Electricity Connection?
A new electricity connection links your property to the local power network, allowing it to access the grid. You’ll typically need one if:
You’re building a new home or commercial unit
You’re splitting an existing supply across multiple units
You’re upgrading from a temporary to a permanent supply
Who Handles Electricity Connections?
There are two main types of providers:
DNOs (Distribution Network Operators): These are the regional companies licensed to operate the electricity networks in the UK.
IDNOs (Independent Distribution Network Operators): These are accredited alternatives to DNOs who can often offer more competitive pricing and quicker lead times.
At Morganised Multi Utility, we submit your application and gather quotes from both, so you can choose the option that works best for your project.
What You Need Before Applying
Before we begin the application process, you’ll need to provide:
Full site address
Planning permission reference (if applicable)
Site layout plan with boundaries and access points
Maximum power demand (your electrician can help calculate this)
MPAN if upgrading or altering an existing connection
The Electricity Connection Process – Simplified
Step | What Happens | Who’s Responsible |
1. Application | We submit applications to the DNO and IDNOs on your behalf. | You provide plans and details. |
2. Quotes & Options | You receive costs and timeframes from multiple providers. | We explain each option clearly. |
3. Acceptance & Payment | You choose your preferred provider and approve the connection. | We manage communication and timelines. |
4. Site Visit & Scheduling | Site inspection arranged; permits confirmed. | We coordinate all logistics. |
5. Connection & Metering | Physical works completed, meter installed. | We manage the process end-to-end. |

Real Example from Our Work
A medium-sized developer came to us needing a new electric connection for a 10-unit residential scheme. They didn’t have time to deal with the application process while managing other active sites;
We took over the admin
Coordinated quotes from both DNO and IDNOs
Identified cost savings of over 20% with an accredited independent provider
Scheduled works to align with water and gas installations—reducing delays and excavation costs
The result? A connected, energised site with less stress and more control for the developer.
Let Us Take It Off Your To-Do List
At Morganised Multi Utility, we don’t dig trenches but we dig into the admin, quotes, and coordination behind every successful utility connection. With one point of contact and zero jargon, we keep your project moving forward.
Ready to connect? Get in touch to find out how we can manage your electricity applications with confidence.